亚日韩在线视频官网,亚洲a∨天堂无码麻豆电影,人妻超清中文字幕乱码一区,青青草原精品国产亚洲AV

高密市萬(wàn)豪機(jī)械有限公司
  • 高密市萬(wàn)豪機(jī)械有限公司
  • 高密市萬(wàn)豪機(jī)械有限公司
  • 高密市萬(wàn)豪機(jī)械有限公司
Product classProduct class
Gaomi Wanhao Machinery Co., Ltd.

Contact: Manager Guo

Mobile:13646362678

Tel:0536-2757298

URL:wanhaojixie.cn

Mailbox:wh@wanhaojixie.cn

Address: Xiazhuang Industrial Park, Gaomi City, Shandong Province, China

current position:Home> News>Summary of construction experience of ductile iron pipe fittings
Pageviews:569 Release date:2021-10-12 0:00:00

Summary of construction experience of ductile iron pipe fittings

No matter which industry you are in, over time, you will always accumulate some relevant experience in these industries. The same is true for the construction of ductile iron pipe fittings. The staff have been working in this post for a long time and have an understanding of its construction requirements and precautions. Let's take a look at the summary of their construction experience, which is as follows:

Construction of ductile iron pipe fittings

1. If the construction is in summer, vegetable oil should be used as the lubricating oil, and the joints can be covered with soil. If it is a cold winter, the rubber ring can be preheated with hot water. The purpose of this is to reduce the hardness to ensure rapid installation.

2. Before installation, the rubber ring can be soaked with water to better complete the installation work.

3. If you need to borrow the pipe during installation, if the rotation angle of the pipe itself cannot be satisfied, you can borrow the rotation angle according to the required angle. After calculation, cut the pipe socket and oblique the opening, which can increase the borrow rotation. Angle, and can ensure safe use.

4. If there is no condition to test the pressure with water, you can also consider using air to test the pressure.

5. Three links and elbows must be made of concrete buttresses. The trench backfill should be compacted in layers. If the pipeline crosses the road, in order to avoid crushing the pipe body, coarse sand can be backfilled to the top of the pipe.

6. In order to avoid the phenomenon of interface dripping during construction. During installation, the construction should be carried out in strict accordance with the specifications, and each pipe should be installed in place. For large-diameter pipes, the condition of each joint apron should be checked.

In fact, there are many points that need to be paid attention to during construction. Here is a brief introduction to some frequently encountered problems that need to be paid attention to during construction. The above information is a summary of the construction experience of ductile iron pipe fittings. I hope it will be helpful to you during your operation! 
與此原文有關(guān)的更多信息要查看其他翻譯信息,您必須輸入相應(yīng)原文

 
 Shandong Gaomi Marriott Machinery Co., Ltd

Address: Xiazhuang Industrial Park, Gaomi City, Shandong Province, China 

Contact: Manager Guo Mobile: 13646362678 URL:wanhaojixie.cn

Tel: 0536-2757298  技術(shù)支持:企化網(wǎng)絡(luò) 魯ICP備16040285號(hào)-1

杭锦旗| 六安市| 周至县| 九台市| 金平| 广汉市| 灵丘县| 沙洋县| 新乐市| 苍南县| 安顺市| 巫山县| 凤冈县| 德阳市| 六枝特区| 辽源市| 张家川| 平安县| 兴城市| 阿克陶县| 广汉市| 牙克石市| 彰化市| 射洪县| 五寨县| 北碚区| 宁都县| 连山| 乌拉特后旗| 金沙县| 怀仁县| 水城县| 陇川县| 通州区| 浦城县| 耒阳市| 秭归县| 南昌县| 溧阳市| 三江| 东兴市|